Your project, in focus.Explore the details 01What we can help with.
- Cooling planned around occupancy, heat loads, room layout and operating hours.
- Scope installation, alterations, replacement or maintenance around the tenancy.
Scope and site details
- Define the tenancy or building area served and distinguish air-conditioning from any separate ventilation requirement.
- Landlord equipment, controls and specialist areas may have different owners.
- The scope should include commissioning, access and maintenance responsibilities.
- If the business changes its occupancy or heat-producing equipment, the design may need review even when the existing unit still operates.
02What matters for your job.
- Meeting rooms, open workspaces, kitchens and retail areas can have different loads.
- Existing landlord equipment and ventilation arrangements need to be understood.
- Cooling equipment alone does not establish that a premises has appropriate fresh-air provision.
03Before we visit.
- Tenancy plan and occupancy
- Operating hours and internal equipment
- Landlord requirements and existing assets
- Permitted shutdown windows
More to consider
- Provide tenancy plans, occupancy estimates and equipment schedules.
- Identify landlord approvals, ceiling access and permissible interruption windows.
- Define who controls the system and who maintains each component after handover.
04A clear handover.
- Review operation with the nominated site contact and record the installed equipment, control zones and maintenance responsibilities.
- Confirm access requirements and any landlord-owned components.
- Leave a clear process for reporting comfort issues with room, time and operating conditions.
05Can a residential-style split system suit a workplace?
- It may suit some spaces, but selection needs a proper assessment of load, use and installation conditions.
- The commercial setting should not be sized by room area alone.
06Who maintains equipment in a leased premises?
- The lease and building arrangements determine responsibility. Confirm the owner, tenant and facilities contacts before booking.
- Agree a service-approval and fault-reporting contact. The installation scope does not decide contractual responsibility.