Your project, in focus.Explore the details 01What we can help with.
- Workstation power, task and display lighting, equipment supplies and circuit alterations.
- Plan the work around your tenancy layout, operating hours and equipment schedule.
Scope and site details
- The electrical fit-out boundary should distinguish tenancy work from landlord equipment, utility services and specialist installations.
- Emergency systems, signage and connected equipment may have separate design or approval requirements.
- Confirm temporary power and staged occupancy arrangements.
- A retail counter relocation can also affect data, lighting and joinery, so one marked plan should guide all involved trades.
02What matters for your job.
- A retail display, medical consultation room and warehouse packing bench have different needs.
- Coordinate power with data outlets, signage, joinery and any landlord-controlled systems.
- Spare capacity should be considered without assuming that the incoming supply can support every future addition.
03Before we visit.
- Tenancy and landlord requirements
- Furniture and equipment plan
- Operating and construction schedules
- Required handover documentation
More to consider
- Share lease requirements, fit-out drawings, equipment loads and the handover date.
- Identify shutdown windows and works that need landlord or centre-management approval.
- Confirm who will maintain records when the tenancy changes.
04A clear handover.
- Walk through the tenancy with the equipment and furniture schedule.
- Confirm lighting controls, outlet positions and the agreed supplies for business equipment.
- Retain circuit information and completion records, and identify any landlord-controlled or unfinished work that remains outside the fit-out handover.
05Can work happen while the business stays open?
- Some work can be staged, but access and isolation requirements determine what is practical.
- Agree the sequence and any interruptions before setting an occupancy or opening date.
06Can existing lighting and outlets be retained in a new tenancy layout?
- Existing fittings may stay where their condition, position and capacity suit the new use.
- Check them against the new equipment and layout. A previous tenant’s installation may not support the next business.