Electrical

Rewiring and renovation wiring in Perth

Coordinate electrical wiring with the walls, ceilings and rooms being changed.

Discuss your project
Renovation plans and material samples on a table in a modern home. Illustrative rewiring-planning scene.
Your project, in focus.Explore the details

What we can help with.

  • Lighting, power and appliance wiring planned around your renovation.
  • Coordinate rough-in, fit-off and testing, including replacement of wiring found unsuitable.
Scope and site details
  • A wiring scope should identify existing circuits to retain, areas to alter and provisional work pending inspection.
  • Kitchen, bathroom and external areas need coordination with other trades.
  • Temporary power, removal of old fittings and reinstatement of finishes should be assigned explicitly.
  • A plan for future equipment can include provisions without claiming that every future device will suit them.

What matters for your job.

  • Decide equipment positions before joinery and wall linings are finalised.
  • Kitchen appliances, bathroom extraction, study desks and outdoor living areas all influence cable routes.
  • Data, security and air-conditioning provisions can be coordinated while access is available.

Before we visit.

  • Latest architectural and joinery plans
  • Appliance and equipment schedule
  • Builder’s rough-in and lining dates
  • Items to retain or remove
More to consider
  • Supply the latest plans, appliance schedules and builder’s sequence.
  • Record who is responsible for penetrations, patching and making good.
  • Changes after surfaces are finished may require additional access and a revised scope.

A clear handover.

  • Review the final positions against the agreed plan before accepting the room layout.
  • Retain records of completed electrical work and note any variations made during construction.
  • Confirm that unfinished builder work, painting and later equipment connection are assigned to the appropriate party.

Should every older cable be replaced during a renovation?

  • The condition and suitability of the installation need assessment.
  • The age of the house alone does not define the required work, and concealed areas may require investigation before the final scope is known.

What happens if the room layout changes after rough-in?

  • Tell the electrician before the next construction stage. Moved walls, islands or doors can affect installed cables, switches and outlets.
  • Record the revised layout and agree extra work before surfaces are closed, while adjustments are easier to access and document.
Ready when you are.

Tell us what needs doing.

Call Servicewest

Your property. The details that matter.

See the detail.Plan your next step.

Explore the topics. Keep the points you want to discuss in your own notes.

Explore the plan01 / 04
Renovation wiring planning sequence showing room layout, concealed cable routes, finished lighting and verification equipment.
Illustrative overview · explore the details alongside it.
Currently exploringDesign layout
Useful to have ready
  • Latest architectural and joinery plans
  • Appliance and equipment schedule
  • Builder’s rough-in and lining dates
  • Items to retain or remove
Choose what to explore4 topics

Details / 01

Design layout

Confirm the latest room plan, appliance positions and builder’s sequence before routes are set.

Read the full details

Select a topic to change the details. Save anything you want to discuss.

Sources & further reading

A good place to start

What’s on
your list?

One repair or a longer list.
Let’s work out the next step together.

Perth & Peel · Homes, workplaces & shared spaces

Your next project

Where shall we start?

Electrical selected

Lighting, power or a fault to investigate. Tell us what needs attention.