Your project, in focus.Explore the details 01What we can help with.
- Lighting, power and appliance wiring planned around your renovation.
- Coordinate rough-in, fit-off and testing, including replacement of wiring found unsuitable.
Scope and site details
- A wiring scope should identify existing circuits to retain, areas to alter and provisional work pending inspection.
- Kitchen, bathroom and external areas need coordination with other trades.
- Temporary power, removal of old fittings and reinstatement of finishes should be assigned explicitly.
- A plan for future equipment can include provisions without claiming that every future device will suit them.
02What matters for your job.
- Decide equipment positions before joinery and wall linings are finalised.
- Kitchen appliances, bathroom extraction, study desks and outdoor living areas all influence cable routes.
- Data, security and air-conditioning provisions can be coordinated while access is available.
03Before we visit.
- Latest architectural and joinery plans
- Appliance and equipment schedule
- Builder’s rough-in and lining dates
- Items to retain or remove
More to consider
- Supply the latest plans, appliance schedules and builder’s sequence.
- Record who is responsible for penetrations, patching and making good.
- Changes after surfaces are finished may require additional access and a revised scope.
04A clear handover.
- Review the final positions against the agreed plan before accepting the room layout.
- Retain records of completed electrical work and note any variations made during construction.
- Confirm that unfinished builder work, painting and later equipment connection are assigned to the appropriate party.
05Should every older cable be replaced during a renovation?
- The condition and suitability of the installation need assessment.
- The age of the house alone does not define the required work, and concealed areas may require investigation before the final scope is known.
06What happens if the room layout changes after rough-in?
- Tell the electrician before the next construction stage. Moved walls, islands or doors can affect installed cables, switches and outlets.
- Record the revised layout and agree extra work before surfaces are closed, while adjustments are easier to access and document.