Your project, in focus.Explore the details 01What we can help with.
- Cool air drawn through wet media and distributed around the property.
- Plan roof equipment, water, drainage, ducts and a clear path for air to leave.
Scope and site details
- The proposal should identify the rooftop equipment, ductwork, water connection, drainage, controls and any electrical work.
- Existing ducts or ceiling outlets need assessment for the intended system.
- Roof access and structural or weatherproofing responsibilities must be clear.
- Include how the property will be secured and maintained when relief-air openings are needed during operation.
02What matters for your job.
- Performance depends on outdoor conditions and the ventilation arrangement.
- It differs from refrigerated air-conditioning in operation and comfort control.
- Discuss the expected use and humid-weather limitations before choosing the system.
03Before we visit.
- Building layout and roof details
- Existing cooling equipment
- Water and drain access
- Occupancy and ventilation preferences
More to consider
- Provide a floor plan, roof details and information about existing ducting.
- Consider service access, water connections and window or relief-air arrangements.
- Establish how winter closure and ongoing care will be handled.
04A clear handover.
- Review controls, the intended relief-air arrangement and seasonal user-care instructions.
- Confirm water and drainage work included in the scope, and record access requirements for later servicing.
- Explain what occupants should expect as outside weather conditions change.
05Does evaporative cooling operate with every window closed?
- It needs a suitable path for air to leave the property.
- The correct arrangement should be explained for the installed system and building.
06Can evaporative cooling be replaced with refrigerated ducted air-conditioning?
- A conversion needs a fresh assessment of equipment, ducts, outlets, electrical supply and operation.
- The quote should identify retained and replaced parts, including roof and ceiling repairs. Existing components may not be reusable.