Your project, in focus.Explore the details 01What we can help with.
- Additional or replacement outlets for kitchens, home offices, workshops and workstations.
- We assess your equipment, outlet positions and existing circuits before confirming the work.
Scope and site details
- A replacement outlet in an existing location is different from a new point in a tiled kitchen or a detached workshop.
- The route, wall construction and circuit requirements affect the work.
- Outdoor and damp-area locations also need suitable equipment and placement.
- Include repair of the surrounding finish explicitly if a new opening is required.
02What matters for your job.
- Consider outlet height, furniture clearance, indoor or outdoor exposure and whether equipment needs a dedicated supply.
- Integrated USB outlets can be convenient, while a standard socket offers flexibility as charging technology changes.
03Before we visit.
- Proposed outlet positions on photos
- Appliance names and ratings
- Wall and splashback materials
- Access to the existing switchboard
More to consider
- Mark proposed positions on photos or a floor plan and provide the equipment details.
- Mention tiled walls, stone splashbacks, concealed joinery and furniture that cannot be moved.
- Existing circuit capacity and cable routes need assessment before an installation is confirmed.
04A clear handover.
- Check that outlet positions remain accessible with furniture in place and that the agreed equipment can be connected without awkward leads.
- Record any new circuit identification and retain the relevant completion documents.
- Confirm whether wall repairs or paint touch-ups remain outside the electrical scope.
05Will extra sockets increase the power available?
- Extra outlets do not increase a circuit’s capacity.
- Equipment loads and protective devices need consideration together; adding more connection points may also require circuit work.
06Is a double outlet a substitute for a dedicated appliance circuit?
- Not necessarily. The appliance, wiring and circuit protection determine the supply needed; an extra socket does not replace that assessment.
- Send equipment details before choosing outlets, especially for cooking, workshop or other substantial loads.