Your project, in focus.Explore the details 01What we can help with.
- Assess ageing equipment, unclear circuit labels and limited switchboard space.
- Plan protection and capacity around the existing circuits and your proposed upgrades.
Scope and site details
- The proposal should state whether the enclosure, incoming connection and existing circuits are included.
- A board replacement may reveal circuit faults or other conditions that need separate work.
- Equipment labels, future capacity and access are part of the brief.
- If a supply-provider change is required, its responsibilities and timing should be distinguished from the electrician’s on-site work.
02What matters for your job.
- RCDs and circuit breakers perform different jobs.
- Protection selection, spare space and supply capacity need a site-specific assessment.
- An upgrade brief should also identify future loads such as an EV charger, induction cooking or air-conditioning.
03Before we visit.
- Closed-board photographs
- Known circuit labels and previous reports
- Planned new appliances
- Critical equipment affected by an outage
More to consider
- Provide a photo of the closed switchboard, planned appliance changes and any known tripping history.
- Arrange access and discuss the power interruption.
- Do not remove covers to obtain a better photograph or assume that an old enclosure can be reused.
04A clear handover.
- The handover should explain the circuit labels, the protection installed and the work completed beyond the board itself.
- Retain the relevant documentation and any findings about circuits requiring further attention.
- Ask how the selected devices are to be checked under their manufacturer instructions.
05Does a new switchboard mean the whole house needs rewiring?
- Not automatically.
- Inspection and testing establish what can remain and what needs work.
- The scope should distinguish the board upgrade from circuit repairs or rewiring identified during assessment.
06Can the power stay on while the board is replaced?
- Affected supplies normally need to be interrupted. Plan for refrigerated goods, network equipment and business operations beforehand.
- The installation determines the sequence. Further defects or supply-provider work can change the outage duration.