Your project, in focus.Explore the details 01What we can help with.
- Door hardware, readers and controllers planned around who needs to enter.
- Define permissions and schedules for each user group, with a clear process for managing access.
Scope and site details
- A door-control installation can involve the lock, reader, controller, power, network and door adjustments.
- Door construction and existing fire or emergency arrangements can affect the design.
- Specify which hardware is included and who is responsible for specialist door requirements.
- Remote unlocking should have a defined authorised user and an agreed purpose, rather than being enabled for every account.
02What matters for your job.
- An electronic reader cannot compensate for a door that closes poorly.
- Review the lock, closer, frame and entry sequence together.
- Entry control also needs to accommodate safe exit and the building’s other door requirements.
03Before we visit.
- Door and frame photographs
- Existing locks and closers
- User groups and access times
- Building manager or approval contact
More to consider
- Prepare a door schedule with photos and identify staff, visitors and after-hours users.
- Decide who will administer credentials and approve access changes.
- Any connection to building or emergency systems needs an agreed design and responsibility.
04A clear handover.
- Test the agreed entry methods and the door’s complete closing and locking sequence.
- Demonstrate a permitted user, a denied user and an access change.
- Record who owns administration and what to do if the reader, network or other supporting component is unavailable.
05Can existing doors be retained?
- Often, but suitability depends on the frame, lock, closing action and intended use.
- A door inspection establishes whether hardware can remain or needs alteration.
06What happens when power or the network is unavailable?
- It depends on the hardware, power design and door arrangement. Entry, safe exit and recovery must be addressed for the premises.
- Have those behaviours documented and demonstrated where appropriate. An offline claim alone does not explain every dependency.