Networking & Communications

Network backup power in Perth

Keep selected network equipment powered for a defined outage objective.

Discuss your project
Network equipment and backup power housed in a recessed cabinet. Illustrative network continuity scene.
Your project, in focus.Explore the details

What we can help with.

  • Support selected gateways, switches, recorders or other equipment during a mains interruption.
  • Define the essential services and required runtime before selecting a UPS.
Scope and site details
  • Specify the UPS, connected load, power distribution and any supported shutdown software.
  • Runtime is a design objective to assess with the actual equipment and battery condition.
  • External internet infrastructure, separate switches and remote devices may remain unsupported.
  • Include how battery replacement and alerts will be managed so backup power does not become an unmonitored box in the rack.

What matters for your job.

  • Runtime depends on the actual load, battery condition and UPS capacity.
  • A protected rack does not guarantee internet or phone availability if upstream equipment loses power.
  • Shutdown behaviour also matters for storage devices.

Before we visit.

  • Critical equipment and PoE loads
  • Desired outage objective
  • Available rack and electrical connection
  • Shutdown and monitoring requirements
More to consider
  • Prepare an equipment list and identify PoE-powered devices that add to the load.
  • Confirm the rack space and electrical connection.
  • Plan battery inspection, alerts and an orderly shutdown where supported.

A clear handover.

  • Test the selected outage behaviour in an agreed maintenance window.
  • Record the equipment supported and the conditions of any runtime observation.
  • Confirm alerts and supported shutdown behaviour, and keep battery maintenance responsibility visible in the site records.

Does a UPS keep the entire site online?

  • Only the connected equipment is supported, and external services have their own dependencies.
  • Define the intended outcome and test the selected load rather than promising uninterrupted service.

Should every network device be connected to the UPS?

  • Choose the devices needed for the outage plan, including switches and PoE dependencies.
  • Non-essential loads reduce runtime. Map the complete connection path and test the selected arrangement.
Ready when you are.

Tell us what needs doing.

Call Servicewest

Your property. The details that matter.

See the detail.Plan your next step.

Explore the topics. Keep the points you want to discuss in your own notes.

Explore the plan01 / 04
Network backup-power planning diagram covering critical equipment, load assessment, runtime and an outage test.
Illustrative overview · explore the details alongside it.
Currently exploringCritical equipment
Useful to have ready
  • Critical equipment and PoE loads
  • Desired outage objective
  • Available rack and electrical connection
  • Shutdown and monitoring requirements
Choose what to explore4 topics

Details / 01

Critical equipment

Identify which network equipment must remain available during an interruption.

Read the full details

Select a topic to change the details. Save anything you want to discuss.

Sources & further reading

A good place to start

What’s on
your list?

One repair or a longer list.
Let’s work out the next step together.

Perth & Peel · Homes, workplaces & shared spaces

Your next project

Where shall we start?

Networking & comms selected

Wi-Fi, cabling or connected spaces. Tell us where you need a better connection.