The home, viewed as a whole
This Waikiki project connected several parts of the home technology setup: everyday Wi-Fi, security cameras, shared storage and backup power. The work centred on a new 9RU wall-mounted cabinet, with the NBN equipment relocated inside and CAT6 cabling installed through the property.
Putting the equipment and cable terminations together gave the network a defined home. The supplied photographs show the rack layout, gateway, switch, patch panel and patch leads.
Wi-Fi, cameras and storage
UniFi U7 Wi-Fi formed the wireless part of the installation. Three G6 PTZ cameras were installed as part of the security system, supported by the new network.
A UniFi NAS provided network storage with local and remote access. A UniFi UPS added backup power for the connected equipment. The records do not establish a measured backup duration, so no runtime figure is claimed.
What remains for a later stage
The installation included provisions for future access control. Gate and door access activation were not part of the completed scope. A possible Gate Hub for the side gate and shed roller door remains proposed work.
The distinction is useful when planning a similar installation: cable routes and network provisions can be prepared ahead of the final access equipment and commissioning.
Planning a similar home project
Start with the equipment that is already in the property, the rooms that need reliable connectivity and the camera views you want to cover. Storage, backup power and future access can then be considered alongside the cabinet and cabling.
The final design depends on the property and the agreed scope. This account records the Waikiki installation; it is not a standard package or a promise of the same result at another address.
Equipment and scope
- UniFi home network
- U7 Wi-Fi access points
- 3 × G6 PTZ cameras
- UniFi NAS
- UniFi UPS
- Provisions for future access control
Based on supplied project notes and installation photographs. The records distinguish completed networking and cameras from provisions for future access control. Exact completion dates were not supplied.




